The independent platform for the UK cleaning industry

Running a cleaning business

Pricing a commercial cleaning contract without missing the real costs

Build a contract price from the specification, deliverable hours and complete employment and operating costs. Make assumptions visible before committing to a fixed price.

A defensible cleaning price begins with a deliverable service. Before selecting an hourly rate or multiplying floor area by a benchmark, establish what the client expects and how your team will provide it. The price must support that method throughout the contract.

This guide offers a costing process, not a market rate. It contains no recommended wage, selling price or profit percentage. Use verified employment requirements, actual supplier information and your own operating evidence for the figures.

Turn the enquiry into a specification

List the rooms, surfaces, tasks and frequencies. Distinguish daily attendance from weekly, periodic and reactive work. Record opening days, shutdowns, access windows and any requirement to work around occupants. Identify who supplies washroom consumables and who handles waste after collection.

Write down the acceptance standard. “Clean the offices” leaves too much unresolved: ask which furniture is included, whether occupied desks can be touched and how restricted areas are accessed. Make exclusions explicit. If the specification remains incomplete, issue a qualified proposal or seek clarification rather than hiding uncertainty in an apparently firm price.

Visit and measure the working route

Use a site visit to examine the sequence of work. Measure relevant areas, but also record stairs, security procedures, cupboard locations, water access and the distance to waste collection points. Ask what changes between normal and busy periods.

Observe or trial representative tasks where authorised. Record the conditions behind your time estimate, including equipment and staffing. Do not transfer a productivity assumption from an open, lightly furnished space to a crowded room without checking it. Keep the evidence with the estimate so another manager can understand how the hours were built.

Count the complete service time

Create a task-and-frequency schedule and calculate the annual workload. Include preparation, movement between areas, replenishment, equipment care and the reporting required by the contract. Separate productive cleaning time from the other paid activities needed to deliver it.

Check whether the staffing pattern fits the access window. A total weekly hours figure can conceal an impossible daily plan. Include supervision and arrangements for absences. Make clear which tasks can move within the week and which must be completed at a particular time to meet the client’s operational needs.

Build employment costs carefully

GOV.UK’s employer guidance identifies costs beyond basic wages, including National Insurance, pension responsibilities, statutory payments and insurance. Obtain current payroll inputs for the people and employment arrangements involved. Avoid applying one unexplained uplift to every role.

Include paid leave and the cost of maintaining service while workers are away. GOV.UK confirms that almost all workers have statutory paid-holiday entitlement, with calculation rules depending on their working pattern. Keep employee entitlement and replacement cover visible as separate calculations so that neither is omitted or counted twice.

Check pay compliance separately

For workers doing time work, GOV.UK explains that average hourly pay must meet the applicable minimum wage over the pay reference period. The contract’s selling rate is not evidence that each worker’s pay complies.

Ask payroll to check the proposed working arrangements and pay calculation. Record any assumptions about training, additional duties and travel between assignments for appropriate review. Keep statutory compliance checks separate from commercial decisions about margin. A client discount cannot reduce the employer’s obligations to the people doing the work.

Examine any staff transfer

GOV.UK identifies cleaning outsourcing, changes of contractor and bringing a service back in-house as situations in which TUPE may apply. Do not assume that winning a contract allows you to replace existing terms with your standard employment package.

Seek the relevant workforce information through the authorised process and obtain specialist advice where applicability or liabilities are unclear. Keep personal information restricted to those who need it. Mark unresolved transfer costs clearly in the bid decision. A missing staff schedule is a substantive pricing risk, not an administrative detail to settle after award.

Add operating costs and contract overheads

Build a separate schedule for equipment, servicing, cleaning products, protective equipment, uniforms, transport, supervision and administration. Identify one-off mobilisation costs and recurring costs. Include the tools and time needed for audits, client meetings and agreed reporting.

Check the basis of supplier quotations and the period they cover. Allocate shared costs consistently across contracts, without charging the same cost twice. Distinguish recoverable and non-recoverable tax in your internal calculation with appropriate accounting support, and state clearly how VAT is treated in the customer-facing proposal.

Decide how uncertainty will be handled

List the variables most likely to alter delivery: occupancy, service hours, consumable demand, wage changes and additions to the cleaning area. Test the effect of plausible changes using your own assumptions, labelled as scenarios rather than forecasts.

Use the results to decide whether the price needs a review mechanism, a separate rate for additional work or a tighter specification. Read the proposed contract before relying on future price increases. Record who can authorise variations and how they are priced, instructed and evidenced.

Check the arithmetic and the promise

Calculate revenue, total cost and profit consistently. Profit margin is profit divided by revenue; mark-up is profit divided by cost. Name the measure you use so that two people reviewing the estimate are not comparing different percentages.

Have someone compare the price with the delivery plan and contractual obligations. Check annualisation, frequencies, cover, mobilisation and payment timing. Finally, give the client a proposal that states the service, price basis, assumptions and change process. The aim is a contract your team can deliver as promised and your business can sustain.

Sources

  1. gov.uk: Employment costs and responsibilities including National Insurance, pensions, statutory payments and insurance.
  2. gov.uk: Paid annual-leave entitlement, including part-time and irregular-hours workers.
  3. gov.uk: Minimum-wage assessment for time work over the applicable pay reference period.
  4. gov.uk: TUPE can apply to service provision changes, including cleaning, and may preserve employment terms.

Facts checked against these sources on 19 November 2026. Spotted an error? See our corrections policy.

The CleanBow weekly

The week in UK cleaning, in one short email

New stories, practical guides, jobs and tenders closing soon. Free. Unsubscribe any time.